The construction of a Tesco Express Store (Over 7000 SqFt) which was converted from an old car sales showroom. Impact cleared the internal area and partition walls to allow the new Tesco Express layout and completed the entire internal fit out which comprised the following: 7000 SqFt ceramic floor tiling Over 100SqM of internal walls […]
read moreCase Studies
Hemsworth, West Yorkshire
Working with a major Project Management company, Impact has been awarded a Shopfitting contract in Hemsworth, West Yorkshire. The contract requires complete refurbishment of a run down petrol forecourt kiosk into a bright new kiosk for the Tesco superstore. There is a wide range of tasks required during the refurbishment including the following: Complete new […]
read moreTesco Petrol Filling Station. Rugby, Warwickshire
This Tesco Petrol Filling Station in Rugby had been damaged by a driver who entered the site in a high sided vehicle, became trapped under the canopy and continued to drive to the exit. This resulted in significant damage to the structural steel joists, damage to the fascia panels on a number of elevations and […]
read moreDoor Manufacture. Llandridnod, Wales
This photograph provides an example of a 30 minute fire rated door with white laminate face, edged on all four sides with hardwood lipping, hardwood beading and intumescent mastic around a georgian wired polished plate glass vision panel.
read moreDebenhams. Throughout England & Ireland
Working on over 500 Debenhams sites in England and Ireland over a 12 month period Impact supplied Debenhams with a full stock condition survey of those stores. The survey comprised detailed scale drawings, location plans detailing type and location of every sign, individual dimensions and a photographic log of all signage.
read moreSouthampton, Hampshire
Two Apartments – One single bed with lounge diner & One two bedroom with lounge diner and en-suite to the master bedroom We were required to complete the two apartments within an extremely tight timescale which on occasion resulted in over 30 staff present on site at any given time. The apartments were built in […]
read moreStore Counter. Llandridnod, Wales
The photograph in this case study serves to demonstrate a store service counter that Impact manufactured and installed at a Tesco Petrol Forecourt Kiosk in Llandridnod, Wales. The counter design has ‘evolved’ over recent years to make best use of available space. In this case structural sections are recessed to allow space for electrical conduit […]
read moreHSBC Contract, Nationally
Impact provided a package of maintenance services for the HSBC high street bank. Successful in obtaining an annual contract we attended over 500 sites on two occasions within a 12 month period. The first visit was to replace all defective panel and projecting roundel signs, replace defective lighting systems, clean existing external signage and undertake […]
read more